Backup-line protection panel Three-phase 10 kW

€ 320.65 (VAT included)

In stock

Modular sub-panel for the critical-loads (EPS) line: 25 A 4P breaker, 30 mA type-A RCD, type-II AC SPD and quick-connect terminals for the hybrid inverter backup output. Sized for up to 10 kW.

Specifications

FasesTrifásico
Potencia máx.10 kW
Magnetotérmico25 A 4P
Diferencial30 mA tipo A
SubcategoríaCaja de protección AC

FAQ

Which hybrid inverters is this protection panel compatible with?

The panel is designed to connect to three-phase hybrid inverters via quick-connect terminals on the EPS/backup output. Make sure your inverter's backup output is three-phase and does not exceed 10 kW.

What is the maximum power this panel can handle?

It is rated for systems up to 10 kW in three-phase configuration. The included 25 A 4P circuit breaker is sized to match that maximum power on a three-phase backup line.

What protective devices are included inside the panel?

The panel comes with a 25 A 4P MCB (miniature circuit breaker), a 30 mA Type A RCD (residual current device), and a Type II AC surge protection device (SPD). Together they protect against overcurrents, earth leakage and voltage surges on the critical-load line.

What is an EPS line and why do I need this panel?

EPS (Emergency Power Supply) is the backup output of a hybrid inverter that keeps critical loads running during a grid outage. This panel provides the required protection and safe termination for that dedicated backup circuit.

Do I need to buy any additional components for installation?

The panel includes quick-connect terminals for the inverter side, but you will need appropriate three-phase cabling between the inverter and the panel, as well as wiring to your critical loads. Installation must be carried out by a qualified electrician.

Why is a Type A RCD used instead of a standard Type AC?

Type A RCDs detect both sinusoidal AC leakage currents and pulsating DC leakage currents, which are common in circuits connected to inverters and other power electronics. The panel already includes a 30 mA Type A unit as required for this application.

Backup-line protection panel Three-phase 10 kWBackup-line protection panel Three-phase 10 kW

Shipping across Spain. Delivery in 2-4 business days on the mainland (in-stock products). 14-day return window.

Backup-line protection panel Three-phase 10 kW — Bilotex Shop