Growatt TPM-6CTA-C-100 three-phase smart meter (2×3 CT, 100 A)
€ 269.55 (VAT included)
On order — ships in ~10 days
- SKU: 03030002
- Brand: Growatt
- Category: Inverters
Specifications
| Subcategory | Smart meter / Wattmeter |
|---|---|
| Phases | Three-phase |
| Corriente máx. | 100 Amps |
| Transformadores (CT) | 2 × 3 CT, núcleo abierto |
| Communication | RS485 (2 puertos) |
FAQ
Which inverters does it work with?
Growatt three-phase inverters (MOD, MID, SPH/SPA, WIT) that support an RS485 meter. We confirm the exact model when preparing the quote.
What are the two CT sets for?
One set of 3 CTs measures the grid supply; the second can measure an existing PV system (AC coupling) so the inverter accounts for all production.
Do cables need to be cut to fit the CTs?
No — the CTs are split-core and clamp around the cable. The meter sits on the DIN rail in the panel; a certified electrician installs it.
Is it needed for zero export?
Yes. Without a meter at the connection point the inverter can't see the home's consumption, so it can't limit grid export or charge the battery from surplus.
Shipping across Spain. Delivery in 2-4 business days on the mainland (in-stock products). 14-day return window.
Growatt TPM-6CTA-C-100 three-phase smart meter (2×3 CT, 100 A) — Bilotex Shop